Residential
Holland-on-Sea, Kings Parade
Project Details
We built ten new build flats on the sea front of Holland-on-Sea comprising of spacious 10 x 3 bedroom. First stage, we started groundwork, then installed beam and block floor. Second stage, we began brick work, scaffolding, building front end porches and waterproofing flat roof. Third stage, we carried out electrical wiring throughout, plastering, installed double glazed UPVC windows and doors, and external drainage pipework. Fourth stage, we installed staircases and banister rail to access individual flats, installed central heating system for each individual flat, installed all ceiling lights electrical points and smoke detectors, installed wood flooring in each individual flat, carried out all plumbing work followed by bathroom and kitchen installation for each flat. Final stage, we started painting and decorating, external wall silicone rendering and working on external grounds including access staircase with guard rails, block paving, fencing, and building private gated car park.
Key Deliverables
Architectual ServicesBathroom InstallationBlock FloorBlock PavingCar ParkCentral HeatingDecorDoorsElectricalExternal GroundsFlooringKitchen InstallationNew Build ResidentialNew Zinc RoofPainting & DecoratingPlumbingRoofingSilicone RenderingUnderfloor HeatingUPVC GlazingWindowsWood Flooring
Property Info
Build Type
Residential
Property Type
Multiple New Build Flats
Location
Essex
Completion
2019
Share this project
Facebook
Twitter
LinkedIn
Tumblr
WhatsApp
Email